“Major Bascule Bridge/Causeway and state of art Control House: Project Scope Includes All Roadway Work ,MOT, Barrier Walls, Erosion/Sedimentation Control, Pavement Removal; Clearing & Grubbing; demo existing structures, Embankment; Storm water Systems, Curb & Gutter, Sidewalk, Sodding, etc; Signalization (Signing & Markings); Lighting; Construction of 2 New Double Leaf 200 feet Bascule Bridges; Post Tensioning, Water Line Relocations, landscaping,etc. All bridge construction off barges.”
Project Details
- Owner: City of Treasure Island
- Location: Treasure Island, Florida
- Performed as: Joint Venture with Obayashi
- Structure Type: Bridge/Transportation
- Completion Date: 08 – August 2007
- Project value: $44,467,958.00
- Awards: Won the FTBA/FDOT Major Bridge award for Best in Construction 2007, also was ranked # 6 by Roads and Bridges Magazine’s Top 10 Bridges for 2007.